AVIACENTER NEWS
01.06.2020
The Сenter for Strategic Development in Civil Aviation (AVIACENTER) has performed feasibility study and forecasting passenger, cargo and mail traffic and air traffic intensity for one of the Moscow Aviation Hub airports for the long term perspective. 
07.05.2020

Embraer Brazilian aircraft conglomerate terminates the M&A deal with Boeing. In an interview to RT, Anton Koren, the General Director of the Сenter for Strategic Development in Civil Aviation (AVIACENTER), suggested that the termination of the deal with Embraer is caused by Boeing’s desire to receive financial support from the US federal government.

24.04.2020

Strategies and master plans for three Siberian airports will be developed by the Сenter for Strategic Development in Civil Aviation (AVIACENTER).

02.03.2020

The key international conference and exhibition on the development of UAS ‘Unmanned Aviation – 2020’ will be held in Moscow on April 23-24, 2020.

10.01.2020

The Center for Strategic Development in Civil Aviation (Aviacenter) became the first independent consulting center in the Russian Federation, the Eurasian Union, the CIS countries, the product range of which features over 100 kinds of professional services in the area of aviation industry strategic planning, management and investment consulting.  

AVIACENTER NEWS

Main AVIACENTER NEWS
« Back

AVIACENTER PREPARED AN ECONOMIC JUSTIFICATION FOR CONSTRUCTING A NEW AIRPORT IN THE RUSSIAN FEDERATION  23.08.2019 17:35

AVIACENTER prepared an economic justification for constructing a new airport in the Russian Federation.  23.08.2019 17:35

Experts of the Center for Strategic Development in Civil Aviation (AVIACENTER) completed the project of the concept development and market research of the potential for constructing a new airport and start up of an airline in one of the regions in the European part of the Russian Federation.

The results of the project included: justification of the construction of a new regional airport, calculation of design capacities and identification of development prospects.

The starting point was the analysis of the current demand for air transport services and the dynamics of air transportation development in the region, where a new airport will be constructed. The analysis had also encompassed alternative modes of transport and capacity of the commercial passenger and cargo transportation by air and other modes of transport in this region. A total of 12 air transport segments were analysed.

With regard to commercial segments, the AVIACENTER experts have developed a route network development strategy for a new airport, have identified optimal types of aircraft for passenger transportation and have calculated the required airfield parameters for accommodating the calculated types of aircraft. For the construction planning, the study identified the basic limitations of the land plot and the master-planning were conducted.

In addition, a feasibility study was performed for a new airline to be based at this future airport.

 


kazan240-6

Bespilot_2020_240x160

VIDEOS AVIACENTER

AVIACENTER NEWS